COCOMO II - Constructive Cost Model

Monte Carlo Risk
Auto Calculate

Software Size                Sizing Method


SLOC  % Design Modified % Code Modified % Integration Required Assessment and Assimilation
(0% - 8%)
 Software Understanding
(0% - 50%)
Unfamiliarity
(0-1)
New







Reused





Modified








 Software Scale Drivers
Precedentedness
Development Flexibility

Software Cost Drivers
Product
Required Software Reliability
Data Base Size
Product Complexity
Developed for Reusability
Documentation Match to Lifecycle Needs
 
 
Architecture / Risk Resolution
Team Cohesion
 

Personnel
Analyst Capability
Programmer Capability
Personnel Continuity
Application Experience
Platform Experience
Language and Toolset Experience
 
Process Maturity
 
 

Platform
Time Constraint
Storage Constraint
Platform Volatility

Project
Use of Software Tools
Multisite Development
Required Development Schedule
Maintenance

Software Labor Rates
Cost per Person-Month (Dollars)

Results               

Software Development (Elaboration and Construction)

Effort = 0.0 Person-months
Schedule = 0.0 Months
Cost = $0

Total Equivalent Size = 0 SLOC
Effort Adjustment Factor (EAF) = 1.00

Acquisition Phase Distribution
PhaseEffort (Person-months)Schedule (Months)Average Staff Cost (Dollars)
Inception0.00.00.0 $0
Elaboration0.00.00.0 $0
Construction0.00.00.0 $0
Transition
0.00.00.0 $0

Staffing Profile
Software Effort Distribution for RUP/MBASE (Person-Months)
Phase/ActivityInceptionElaborationConstructionTransition
Management0.00.00.00.0
Environment/CM0.00.00.00.0
Requirements0.00.00.00.0
Design 0.00.00.00.0
Implementation0.00.00.00.0
Assessment0.00.00.00.0
Deployment0.00.00.00.0

Your output file is at http://softwarecost.org/tools/COCOMO/data/COCOMO_April_19_2024_10_32_20_621391.txt

Created by Ray Madachy at the Naval Postgraduate School. For more information contact him at rjmadach@nps.edu.